Davis Construction & Home Improvement LLC BBB Business Review Mon–Fri 8am–5pm
HomeServicesKitchen RemodelingBathroom RemodelingDecks & Screen PorchesDeck PricingFlooring & TileFinished BasementsWindows & DoorsGalleryAboutContactHome Improvement Tips Request Free Estimate (240) 794-2274

Soft spots underfoot, boards that splinter or split, railings that move when you lean on them, and stairs that feel worse every season are signals that the surface of your deck has had its run. If the frame underneath is still sound, a re-deck replaces everything you walk on and hold onto without starting over from the footings. Here’s what to look for, what a re-deck includes with us, and how we handle surprises in the frame.

Walk your deck and check these

Underfoot

  • Spongy or soft boards. Press with your heel near the board ends and around where water sits after rain.
  • Splits, splinters and raised grain on wood boards that catch bare feet.
  • Cupped or warped boards that rock or hold puddles.
  • Screws or nails backing out and standing above the surface.

Railings

  • Posts that wiggle when you push on the top rail.
  • Loose, cracked or missing balusters.
  • Rail sections that have pulled away from a post.

Stairs

  • Treads that flex, crack or slope.
  • Wobbly handrails.
  • Stringers that look dark, split or soft where they meet the ground.

Edges and trim

  • Fascia boards that are loose, stained or rotting.
  • Rusty or corroded hardware where you can see it.

One or two of these on their own may be a simple repair. When several show up at once, especially soft boards plus a wobbly railing, it’s worth having us look at a re-deck.

Why steps fail first

If the stairs are the worst part of your deck, you’re not imagining it. Tony sums it up this way: “load transfer — your body weight doubles as you walk up and down steps, so they take the worst wear and tear.” So the old steps never stay; they get rebuilt as part of the job. Re-deck stair treads go down with screws topped by color-match plugs. Our resurfacing page has more.

What a re-deck includes with Davis Construction

Every re-deck we do gets:

  • All-new decking
  • New railings
  • New fascia
  • Rebuilt steps
  • Up to two failing 12-foot joists replaced at no added cost

Every re-deck gets its hardware updated to Maryland code. We use stainless steel within 300 feet of salt water and hot-dip galvanized everywhere else. Your county’s adopted building code and its inspector have the final say. A new surface is only as good as what’s holding it up.

If the frame needs more than that

Sometimes the old boards come off and the frame tells a different story. If it turns out more than two joists need replacing, we stop and walk around the deck with you to show you what we found. Any extra work goes into a written amendment, and you sign it before the work continues, so any added cost is agreed in writing first.

Re-deck pricing

We charge the new-deck price for a re-deck in whatever material you pick, and the schedule matches too. A few examples:

Material 12×12 12×25
Pressure-treated wood $10,080 $21,000
Escapes / Enhance Basics / Summit tier $12,240 $25,500
Select / Terrain tier $13,680 $28,500

Build times match new decks: 2 to 3 days for a 12×12, 3 to 5 days for a 12×25 and 6 to 8 days for a 16×40. Every line and size appears in the deck price list.

Going from wood to composite on an old frame

A re-deck can also be the time to switch from worn wood boards to composite. Decking makers can set conditions for going over an existing frame. Fiberon’s FAQ is a good example: it allows its boards over existing joists only if the old framing is free of damage and decay, the joists are spaced correctly, air can cross under half the deck without obstruction, the joists sit at least 1.5 inches off the ground, and water drains away instead of collecting underneath. Check the instructions for the line you pick.

Composite gets hidden fasteners, and Fiberon boards get Fiberon’s own EDGE or EDGEX. Our certifications cover Trex, TimberTech and Fiberon; we also install Deckorators. Compare lines on our composite decks page.

Re-deck questions

Is a re-deck cheaper than a new deck?

Not with us. Our re-deck prices match new-deck prices in each material, and the build times match too.

Do I need a permit for a re-deck?

We permit re-decks like any other deck job, and we’re the ones who apply for it.

What if I only want new boards and want to keep my railing?

Our re-decks always include new railings, fascia and steps along with the decking. That’s how we make sure the finished deck is new where it counts.

Have us take a look

If your deck checked several boxes above, let’s see what’s under it. Find an open estimate time or dial 240-794-2274. Your new surface is backed by a one-year workmanship warranty.

Sources: Fiberon Decking Installation FAQ (conditions for installing Fiberon decking over existing joists and framing). Prices, inclusions and the re-deck process come from Davis Construction’s own price list.

Share this post

Subscribe to our newsletter

Keep up with the latest blog posts by staying updated. No spamming: we promise.
By clicking Sign Up you’re confirming that you agree with our Terms and Conditions.

Related posts

Maryland Home Improvement Commission (MHIC) License #118450 · Licensed & Insured