By Tony Davis, owner, Davis Construction & Home Improvement (MHIC #118450)
If you live in a community with a homeowners’ or property owners’ association, a new deck may need two separate yeses: one from the association and one from the county. They’re independent of each other. The county permit doesn’t satisfy the HOA, and HOA approval doesn’t replace the permit. Here’s how to get both without stalling your build.
On This Page
ToggleTwo approvals, two different jobs
| Association approval | County building permit | |
|---|---|---|
| Who decides | Your HOA or POA | The county’s permits office |
| What it looks at | Whatever your association’s own rules cover | Building code, zoning, and site issues like the Critical Area |
| Who handles it on our jobs | Follows your association’s process; we supply the drawing and material details | We pull it |
Calvert County’s residential deck permit page spells out the association side: if a property has a POA or HOA, its approval may be required before construction, and owners should check with the association. That approval is between you and your association.
Chesapeake Ranch Estates, as Tony understands it
Here’s Tony’s answer for homeowners in Chesapeake Ranch Estates: as far as he knows, the association approves exterior work, and exterior structural work like a deck needs a county permit plus the association’s approval. You need both before the build starts.
Every association writes its own rules, so we won’t tell you what yours requires. What we can tell you is how to put together a submission that’s easy for a committee to say yes to.
A five-step way to get through it
- Get the current rules in writing. Ask your association for its architectural guidelines and its application form. Look for anything about materials, colors, railing styles, height, setbacks from lot lines, and how long review takes.
- Book the estimate before you apply. Tony brings product samples, and the quote includes a 3D drawing at no charge.
- Submit a complete package. The 3D drawing shows the committee exactly what’s going up. Pair it with the material and color you picked from the samples and any site sketch your association asks for.
- Let us start the permit. Davis Construction pulls the county permit, so the county side moves on its own track.
- Build after both approvals are in hand. Plan the start date for after the association approves and the county permit is issued.
Choosing materials with the committee in mind
Color and railing style are easier to settle when you can hold the real product. We’re certified with Trex, TimberTech and Fiberon, we install Deckorators too, and we bring product samples to every estimate.
A few railing choices and what they add, so you can price what your association allows:
- Composite decks include our standard white vinyl rail at no extra cost; pressure-treated decks include a standard wood rail.
- Switching the infill to black aluminum pickets: $50 more for each 6–8 ft section.
- All-black aluminum railing, top to bottom: roughly $500 a section, installed.
- Cable infill: $200–$300 extra a section, or roughly $500 a section for a complete cable system.
Compare brands on our Trex, TimberTech and Fiberon pages, then check totals by size on our deck price chart.
Don’t forget the other county overlays
Association approval is only one of the extras Calvert lists. Depending on where you live, the county may also need a Critical Area Worksheet (for properties inside the 1,000-foot Critical Area), Architectural Review in a Town Center or Rural Commercial zone, or a Beach Application Approval inside Chesapeake Beach or North Beach town limits. Our Calvert County deck builder page has more on building there.
HOA approval questions
Can you start building while the HOA reviews?
It’s not a good idea. Starting before the association approves risks building something it later rejects.
Do you deal with the HOA directly?
Your association sets who can submit and how. Whatever its process, the 3D drawing and the material and color details come from us, so the package describes exactly what we’ll build.
What if the HOA asks for a change after I sign?
Tell us before work starts. Our published deck prices are set by size and material, and each product line has its own total (our top-end lines are priced at the estimate).
In St. Mary’s, the county side is laid out in our St. Mary’s County deck permit post.
Get a drawing your committee can approve
A clear drawing and real samples make association review easier. Request your free estimate or talk it over with Tony at 240-794-2274. Past or present military? You qualify for 10% off, up to a $1,000 discount.
Sources: Calvert County, Deck – Residential (POA/HOA approval, Critical Area Worksheet, Architectural Review, Beach Application Approval). Prices, process and the Chesapeake Ranch Estates answer come from Davis Construction.